Unit 7: Cell Division
Th 01/03/19: Hand back scored IA's
Group IV Project Overview and Group sign-ups
Mitosis overview/review worksheet
M 01/07/19: Hand out articles for Group IV Project/sign ups
Onion Root Tip Squash Lab
1.6 PPT and notes
W 01/09/19: PPT/Cancer/Cyclins learning check
Chromosomes
Meiosis chalkboard chromosomes/diagram/checklist
Mitosis vs. Meiosis animation
F 01/11/19: Hand back/correct learning check
Chromosome warm-up/review of mitosis and meiosis
Modeling nondisjunction in meiosis I and II using bead chromosomes
Karyotypes worksheet
T 01/15/19: Go over chromsomes (3.2) in white book
Test over 3.2 (chromosomes), 3.3 + 10.1 (meiosis) and 1.6 (mitosis)
Concept map review
Th 1/17/19: Cell division test!
T 1/22/19: Cell division test retake
Th 1/24/19: Microscope calculations practice/sperm slides
Intro to reproductive system drawing (male)
M 1/28/19: Microscope calculations mini-test
Intro to reproductive system drawing (female)
Group 4 Project planning time
W 1/30/19: No school (weather)
F 2/1/19: Group 4 Project Work Day!
Th 01/03/19: Hand back scored IA's
Group IV Project Overview and Group sign-ups
Mitosis overview/review worksheet
M 01/07/19: Hand out articles for Group IV Project/sign ups
Onion Root Tip Squash Lab
1.6 PPT and notes
W 01/09/19: PPT/Cancer/Cyclins learning check
Chromosomes
Meiosis chalkboard chromosomes/diagram/checklist
Mitosis vs. Meiosis animation
F 01/11/19: Hand back/correct learning check
Chromosome warm-up/review of mitosis and meiosis
Modeling nondisjunction in meiosis I and II using bead chromosomes
Karyotypes worksheet
T 01/15/19: Go over chromsomes (3.2) in white book
Test over 3.2 (chromosomes), 3.3 + 10.1 (meiosis) and 1.6 (mitosis)
Concept map review
Th 1/17/19: Cell division test!
T 1/22/19: Cell division test retake
Th 1/24/19: Microscope calculations practice/sperm slides
Intro to reproductive system drawing (male)
M 1/28/19: Microscope calculations mini-test
Intro to reproductive system drawing (female)
Group 4 Project planning time
W 1/30/19: No school (weather)
F 2/1/19: Group 4 Project Work Day!